首页 馆藏资源 舆情信息 标准服务 科研活动 关于我们
现行 BS EN 13480-4:2017
到馆阅读
收藏跟踪
购买正版
Metallic industrial piping-Fabrication and installation 金属工业管道
发布日期: 2017-09-22
BS EN 13480-4:2017规定了管道的制造和安装要求 根据EN 13480设计的系统,包括支架?3:2017.交叉引用:EN ISO 15610:2003EN ISO 13920EN ISO 15613:2004EN ISO 15611:2003EN ISO 15614-1:2004EN ISO 15609 EN ISO 15612:2004EN 13480-5:2017EN ISO 4063(ISO 4063:2009)ASEN ISO 5817(ISO 5817:2014)ASEN ISO 17663(ISO 17663:2009)ASEN 12952-5:2011EN 13480-2:2017EN ISO 3834-3(ISO 3834-2005)ASEN ISO TR 9606-1:2013EN 13480-3:2017EN ISO 14732:2013(ISO/TR 15608:2017)ASEN 10204:2004 EN ISO 9692-1(ISO 9692-1:2013)ASEN 13445- 4:2014EN 1708-3:2012CEN/TS 1591-4:2007EN 13445-3:2014EN ISO 8501-1(ISO 8501-1:1988 AS)BS EN 287-1:2011EN ISO 14731(ISO 14731:2006)ASEN 1418:1997EN 1708-1:2010EN 1011EN ISO 9692-4EN ISO 9692-2购买本文件时可提供的所有现行修订版。
BS EN 13480-4:2017 specifies the requirements for fabrication and installation of piping systems, including supports, designed in accordance with EN 13480?3:2017.Cross References:EN ISO 15610:2003EN ISO 13920EN ISO 15613:2004EN ISO 15611:2003EN ISO 15614-1:2004EN ISO 15609EN ISO 15612:2004EN 13480-5:2017EN ISO 4063 (ISO 4063:2009) ASEN ISO 5817 (ISO 5817:2014) ASEN ISO 17663 (ISO 17663:2009) ASEN 12952-5:2011EN 13480-2:2017EN ISO 3834-3 (ISO 3834-3:2005) ASEN ISO 9606-1:2013EN 13480-3:2017EN 13480-1:2017EN ISO 14732 (ISO 14732:2013) ASCEN ISO/TR 15608 (ISO/TR 15608:2017)ASEN 10204:2004EN ISO 9692-1 (ISO 9692-1:2013) ASEN 13445-4:2014EN 1708-3:2012CEN/TS 1591-4:2007EN 13445-3:2014EN ISO 8501-1 (ISO 8501-1:1988 AS)BS EN 287-1:2011EN ISO 14731 (ISO 14731:2006) ASEN 1418:1997EN 1708-1:2010EN 1011EN ISO 9692-4EN ISO 9692-2All current amendments available at time of purchase are included with the purchase of this document.
分类信息
发布单位或类别: 英国-英国标准学会
关联关系
研制信息
相似标准/计划/法规
现行
UNE-EN 13480-4-2003
METALLIC INDUSTRIAL PIPING - PART 4: FABRICATION AND INSTALLATION.
金属工业管道.第4部分:制造和安装
2003-01-17
现行
NORSOK M-622
Fabrication and installation of GRP piping systems
玻璃钢管道系统的制造和安装
2005-04-30
现行
BS EN ISO 14692-4-2017
Petroleum and natural gas industries. Glass-reinforced plastics (GRP) piping-Fabrication, installation and operation
石油和天然气工业 玻璃钢(GRP)管道
2017-10-23
现行
DIN EN 13480-4/A2-DRAFT
Draft Document - Metallic industrial piping - Part 4: Fabrication and installation; German and English version EN 13480-4:2017/prA2:2020
文件草案-金属工业管道-第4部分:制造和安装;德语和英语版本EN 13480-4:2017/prA2:2020
2020-06-01
现行
DIN EN 13480-4/A1-DRAFT
Draft Document - Metallic industrial piping - Part 4: Fabrication and installation; German and English version EN 13480-4:2017/prA1:2018
文件草案-金属工业管道-第4部分:制造和安装;德语和英语版本EN 13480-4:2017/prA1:2018
2018-11-01
现行
PIP PNFJ8000
Jacketed Piping Fabrication and Installation Details [Complete Revision]
夹套管道制造和安装详图【完整修订】
2019-02-01
现行
PIP PLSC0001(R2021)
Fabrication and Examination of ASME B31.8 Metallic Piping
ASME B31的制造和检验 8金属管道
2016-08-01
现行
BS EN 13480-1-2017+A1-2019
Metallic industrial piping-General
金属工业管道
2020-01-17
现行
BS EN 13480-2-2017+A8-2021
Metallic industrial piping-Materials
金属工业管道
2022-03-31
现行
GB/T 20801.4-2020
压力管道规范 工业管道 第4部分:制作与安装
Pressure piping code—Industrial piping—Part 4:Fabrication and assembly
2020-11-19
现行
AS ISO 14692.4-2022
Petroleum and natural gas industries - Glass-reinforced plastics (GRP) piping, Part 4: Fabrication, installation and operation
石油和天然气工业玻璃钢管道第4部分:制造、安装和操作
2022-05-13
现行
ISO 14692-4-2017
Petroleum and natural gas industries — Glass-reinforced plastics (GRP) piping — Part 4: Fabrication, installation and operation
石油和天然气工业 - 玻璃增强塑料(grp)管道 - 第4部分:制造 安装和操作
2017-08-17
现行
GB/T 29165.4-2023
石油天然气工业 玻璃纤维增强塑料管 第4部分:装配、安装与运行
Petroleum and natural gas industries—Glass-reinforced plastics (GRP) piping—Part 4: Fabrication, installation and operation
2023-11-27
现行
SH/T 3562-2017
石油化工管道工厂化预制加工及验收规范
Specification for piping shop fabrication and acceptance in petrochemical industry
2017-04-12
现行
BS EN 13480-6-2017+A1-2019
Metallic industrial piping-Additional requirements for buried piping
金属工业管道
2020-01-17
现行
LD/T 76.4-2000
化工安装工程工艺管道制作、安装劳动定额
Work quota for the process pipe fabrication and installation of chemical engineering
2001-03-05
现行
MIL MIL-DTL-17813/5 Notice 2-Validation 2
Expansion Joints, Pipe, Metallic, Single Bellows, Fabricated
制造的单波纹管金属膨胀节
2019-03-19
现行
MIL MIL-DTL-17813/5
Expansion Joints, Pipe, Metallic, Single Bellows, Fabricated
装配式金属单波纹管膨胀节
2009-08-29
现行
BS EN 13480-5-2017+A2-2021
Metallic industrial piping-Inspection and testing
金属工业管道
2022-03-11
现行
SY/T 6078-2018
金属立式储罐制作安装工程劳动定额
Labour quota for fabrication and installation engineering of vertical metal tank
2018-10-29