Gas turbines — Procurement — Part 8: Inspection, testing, installation and commissioning
燃气轮机——采购第8部分:检查、测试、安装和调试
发布日期:
2002-07-11
ISO 3977的本部分规定了确保包装商产品和服务完整性的系统和程序原则。
它对成套设备和成套设备所需的检查、测试、安装和调试提供了指导。它概述了买方和包装商之间在检查、协调、报告和记录方面的责任。
This part of ISO 3977 states the principles for systems and procedures to assure the integrity of a packager's product and services.
It gives guidance on the inspection, testing, installation and commissioning required for the package and packaged equipment. It outlines the responsibilities between the purchaser and packager for inspection, coordination, reporting and recording.