首页 馆藏资源 舆情信息 标准服务 科研活动 关于我们
现行 AWWA JAW41433
到馆提醒
收藏跟踪
购买正版
Journal AWWA - Incremental and Average Cost Methods in Rate Design AWWA期刊-费率设计中的增量和平均成本法
发布日期: 1996-06-01
关于在水价设计中整合增量成本和平均成本的实用性的争论仍在继续。州监管委员会和对市政当局有管辖权的地方机构传统上在水价设计中使用平均成本或嵌入成本。虽然在水价设计中采用边际成本或增量成本远不完美,但增量成本结果既可以作为确定费率差异的基础,也可以作为设定具体费率的标准。费率设计师应认真考虑在费率设计中整合增量成本和平均成本。包括11个参考文献和表格。
Debate continues over the practicality of integrating incremental and average costs in water rate design. State regulatory commissions and local agencies having jurisdiction over municipalities have traditionally used average or embedded costing in water rate design. Although employing marginal or incremental costs in water rate design is far from perfect, incremental cost results can be used both as the basis for determining rate differentials and a standard for setting specific rates. Rate designers should give serious consideration to integrating incremental and average costs in rate design. Includes 11 references, tables.
分类信息
发布单位或类别: 美国-美国给水工程协会
关联关系
研制信息
相似标准/计划/法规