This powerpoint presentation begins by providing a brief overview of the Gwinnett County Department of Water Resources Energy Management and Operations (EM&O) Optimization Project, including optimization project drivers and initial feasibility study analysis. Detailed design of EM&O is presented, including:
system configuration and benefits;
HAZOP meetings and constraints;
hydraulic analysis;
feasibility study and savings review;
EMS software design specification; and,
SCADA / HMI interface and IT Design. The implementation plan and schedule is presented, along with a review of savings and return on investment. Includes tables, figures.