This slide presentation outlines a project to rehabilitate Buffalo, New York's historic water filtration plant. The presentation begins with a system overview, and lists details of the water treatment plant
filtration, initial identification of need. Study findings included: excessive moisture in pipe galleries; structural deterioration; HVAC issues; electrical and instrumentation problems; hazardous materials; and filter bed issues. Recommended upgrades are outlined, along with project status, projected schedule and cost estimates.