首页 馆藏资源 舆情信息 标准服务 科研活动 关于我们
现行 GB/T 13632-1992
到馆阅读
收藏跟踪
购买正版
监督压水堆堆芯充分冷却的测量要求 Measurements for monitoring adequate cooling within the core of pressurized light water reactors
发布日期: 1992-08-29
实施日期: 1993-04-01
分类信息
关联关系
研制信息
相似标准/计划/法规
现行
IEC 60911-1987
Measurements for monitoring adequate cooling within the core of pressurized light water reactors
用于监测加压轻水反应堆核心内的充分冷却的测量
1987-03-30
现行
KS C IEC 60911(2019 Confirm)
가압 경수형 원자로 노심 내부의 냉각 감시를 위한 측정
用于监测加压轻水反应堆核心内的充分冷却的测量
2004-10-30
现行
IEC 61343-1996
Nuclear reactor instrumentation - Boiling light water reactors (BWR) - Measurements in the reactor vessel for monitoring adequate cooling within the core
核反应堆仪器 - 沸腾轻水反应堆(BWR) - 用于监测核心内的充分冷却的反应堆容器中的测量
1996-03-20
现行
GB/T 13632.2-2006
监督压水堆堆芯充分冷却的测量要求 第2部分:冷停堆期间监测仪表的要求
Measurements for monitoring adequate cooling within the core of pressurized light water reactors Part 2: Instrumentation requirements during cold shutdown
2006-03-02
现行
IEC 62117-1999
Nuclear reactor instrumentation - Pressurized light water reactors (PWR) - Monitoring adequate cooling within the core during cold shutdown
核反应堆仪表.加压轻水反应堆(PWR).冷停堆期间堆芯内充分冷却的监测
1999-12-10
现行
KS C IEC 62117(2019 Confirm)
원자로 계측-가압경수로- 저온정지 중 노심 내 적정 냉각 감시
核反应堆仪表-加压轻水反应堆(PWR)-冷停堆期间监测堆芯内的充分冷却
2009-12-22
现行
BS IEC 62117-1999
Nuclear reactor instrumentation. Pressurized light water reactors (PWR). Monitoring adequate cooling within the core during cold shutdown.
核反应堆仪表 加压轻水反应堆(PWR) 在冷停堆期间监测堆芯内的充分冷却
2000-02-15
现行
BS IEC 62118-2000
Nuclear reactor instrumentation. Pressurized water reactor (PWR) of VVER design. Monitoring adequate cooling within the core during cold shutdown
核反应堆仪表 VVER设计的压水堆(PWR) 在冷停堆期间监测堆芯内的充分冷却
2001-04-15
现行
DIN IEC 62117
Nuclear power plants - Pressurized light water reactors - Monitoring adequate cooling within the core during cold shutdown (IEC 62117:1999)
核电厂.加压轻水反应堆.冷停堆期间堆芯充分冷却的监测(IEC 62117-1999)
2001-10-01