首页 馆藏资源 舆情信息 标准服务 科研活动 关于我们
现行 NB/T 20662-2023
到馆提醒
收藏跟踪
购买正版
压水堆核电厂工况分类
发布日期: 2023-05-26
实施日期: 2023-11-26
适用于压水堆核电厂确定论安全分析中的工况划分,其他堆型可参考使用
分类信息
关联关系
研制信息
相似标准/计划/法规
现行
NB/T 20035-2011
压水堆核电厂工况分类
Categorization of conditions of PWR nuclear power plants
2011-07-01
现行
GB/T 40860-2021
压水堆核电厂设计扩展工况分析要求
Analysis requirements for design extension conditions of pressurized water reactor nuclear power plants
2021-10-11
现行
GB/T 42141-2022
压水堆核电厂事故工况核岛厂房辐射防护设计准则
Radiation protection design criterion for nuclear island building under accident condition of presssurized water reactor nuclear power plant
2022-12-30
现行
T/CNS 87-2022
压水堆核电厂未堆熔的设计扩展工况清单分析导则
2022-12-16
现行
NB/T 20574-2019
压水堆核电厂调试术语
2019-12-30
现行
NB/T 25009-2012
压水堆核电厂能量统计规程
Energy statistics procedure in pressurized water nuclear power plants
2012-10-19
现行
HJ 842-2017
压水堆核电厂应急相关参数
Emergency-related parameters for presurrized water reactor nuclear power plants
2017-07-07
现行
GB/T 17569-2021
压水堆核电厂物项分级
Classification for the items of pressurized water reactor nuclear power plants
2021-10-11
现行
EJ/T 561-2000
压水堆核电厂安全停堆设计准则
Design criteria for safe shutdown of pressurized water reactor nuclear power plants
2001-02-28
现行
EJ/T 321-1998
压水堆核电厂堆内构件设计准则
Design criterion of reactor internals for pressurized water reactor nuclear power plants
1998-10-13
现行
NB/T 20524-2018
压水堆核电厂安全停堆设计准则
2018-12-10
现行
EJ/T 1114-2000
压水堆核电厂反应堆首次装料试验
Initial loading test for PWR nuclear power plant
2001-02-28
现行
NB/T 20407-2017
压水堆核电厂堆内构件设计制造规范
Specification for design and fabrication of reactor vessel internals in pressurized water reactor nuclear power plants
2017-02-10
现行
NB/T 20382-2016
压水堆核电厂堆内构件的振动监测
Vibration monitoring of internal structures in pressurized water reactor nuclear power plants
2016-02-05
现行
NB/T 20434-2017
压水堆核电厂反应堆首次装料试验
Initialloading test for pressurized water reactor of nuclear power plant
2017-04-01
现行
GB/T 41591-2022
压水堆核电厂反应堆首次临界试验
Initial criticality tests for pressurized water reactor of nuclear power plants
2022-07-11
现行
NB/T 20436-2017
压水堆核电厂水化学控制
Water chemistry for pressurized water reactor nuclear power plant
2017-04-01
现行
NB/T 20509-2018
压水堆核电厂机组负荷扰动试验
Unit load swing test for pressurized water reactor nuclear power plant
2018-03-22
现行
NB/T 20168-2012
压水堆核电厂止回阀鉴定规程
Qualification procedure for check valve of pressurized water reactor nuclear power plants
2012-10-19
现行
NB/T 20275-2014
压水堆核电厂螺柱焊接规范
Stud welding specification for pressurized water reactor nuclear power plants
2014-06-29