首页 馆藏资源 舆情信息 标准服务 科研活动 关于我们
现行 ISO 4917-6:2024
到馆提醒
收藏跟踪
购买正版
Design of nuclear power plants against seismic events — Part 6: Post-seismic measures 核电站抗震设计第6部分:地震后措施
发布日期: 2024-02-27
本文件适用于水冷堆核电厂。 本文件不适用于强于设计基准地震的地震。 本文件规定了核电站地震准备和地震后应采取的行动指南。本文件旨在作为地震后核电站继续运行、关闭和重启的决策指南。它还可用于协助运营组织制定和实施地震前和地震后的总体行动计划,以根据现场经历的地震地面运动水平和工厂的抗震设计水平来处理情况。

This document applies to nuclear power plants with water cooled reactors.

This document does not apply to earthquakes stronger than the design basis earthquake.

This document specifies guidance on the actions to be taken in preparation for and following an earthquake at a nuclear power plant. This document is intended to be used as a guideline for decision making regarding continued operation, shutdown and restart of the nuclear power plant after an earthquake. It can also be used to assist operating organizations in the preparation and implementation of an overall pre- and post-earthquake action programme for dealing with situations in accordance with the level of seismic ground motion experienced at the site, and the seismic design level of the plant.

分类信息
关联关系
研制信息
归口单位: ISO/TC 85/SC 6
相似标准/计划/法规