首页 馆藏资源 舆情信息 标准服务 科研活动 关于我们
现行 AHRI 560-2000
到馆阅读
收藏跟踪
购买正版
Absorption Water Chilling and Water Heating Packages 吸收式冷水和热水机组
发布日期: 2000-01-01
本标准适用于单效蒸汽和热流体冷水机组、双效蒸汽和热流体冷水机组以及双效直燃(天然气、石油、液化石油气)冷水/加热机组。还包括多效多回路吸收式冷水机组/加热机组。水是制冷剂,溴化锂是吸收剂。
This standard applies to single-effect steam and hot fluid operated water chilling units, double-effect steam and hot fluid operated water chilling units, and double-effect direct-fired (natural gas, oil, LP gas) water chilling/ heating units. Also included are multiple-effect and multi-loop cycle absorption water chiller/heating units. Water is the refrigerant and LIBR (lithium bromide) the absorbent.
分类信息
发布单位或类别: 美国-美国空调与制冷学会
关联关系
研制信息
相似标准/计划/法规
现行
ASHRAE 182-2020
Standard 182-2020 -- Method of Testing Absorption Water-Chilling and Water-Heating Packages (ANSI Approved)
标准182-2020——吸收式冷水和热水机组的试验方法(ANSI批准)
现行
JB/T 12839-2016
一体式冷水(热泵)机组
Intergrated water chilling (heat pump) package
2016-04-05
现行
GB/T 18430.2-2016
蒸气压缩循环冷水(热泵)机组 第2部分:户用及类似用途的冷水(热泵)机组
Water chilling (heat pump) packages using the vapor compression cycle—Part 2: Water chilling (heat pump) packages for household and similar application
2016-12-13
现行
ASHRAE 182-2008(RA 2013)
Standard 182-2008 (RA 2013) -- Method of Testing Absorption Water-Chilling and Water-Heating Packages (ASHRAE/ANSI Approved)
***过时的***标准182-2008(RA 2013)——吸收式冷水和热水机组的试验方法(经ASHRAE/ANSI批准)
现行
GB/T 25127.2-2020
低环境温度空气源热泵(冷水)机组 第2部分:户用及类似用途的热泵(冷水)机组
Low ambient temperature air source heat pump (water chilling)packages—Part 2:Heat pump (water chilling)packages for household and similar application
2020-06-02
现行
GB/T 18430.1-2007
蒸气压缩循环冷水(热泵)机组 第1部分:工业或商业用及类似用途的冷水(热泵)机组
Water chilling (heat pump) packages using the vapor compression cycle - Part 1:Water chilling (heat pump) packages for industrial & commercial and similar application
2007-11-05
现行
JB/T 13515-2018
带全热回收的容积式冷水(热泵)机组
Positive displacement water chilling (heat pump) packages with full heat recovery
2018-04-30
现行
GB/T 25127.1-2020
低环境温度空气源热泵(冷水)机组 第1部分:工业或商业用及类似用途的热泵(冷水)机组
Low ambient temperature air source heat pump (water chilling)packages—Part 1:Heat pump (water chilling)packages for industrial & commercial and similar application
2020-06-02
现行
YD/T 3601-2019
电信互联网数据中心用冷水机组
Water chilling packages for telecommunication data center
2019-11-11
现行
JB/T 12323-2015
蒸气压缩循环蒸发冷却式冷水(热泵)机组
Evaporatively-cooled water chilling (heat pump) packages using the vapor compression cycle
2015-10-10
现行
GB/T 40411-2021
模块式空调机房设备
Packaged units for supplying hot, cooling or chilled water
2021-08-20
现行
GB/T 10870-2014
蒸气压缩循环冷水(热泵)机组性能试验方法
The methods of performance test for water chilling (heat pump) packages using the vaper compression cycle
2014-06-24
现行
NASA UFGS-23 64 00
PACKAGED WATER CHILLERS, ABSORPTION TYPE
吸收式成套冷水机组
2016-11-01
现行
JJF 1766-2019
冷水机组能源效率计量检测规则
Rules of Metrology Testing for Energy Efficiency of Water Chilling Packages
2019-09-27
现行
CH-12-C041
AHRI Standard 550-590 Overview of Latest Updates Performance Rating of Water-Chilling and Heat Pump Water-Heating Packages Using the Vapor Compression Cycle
AHRI标准550-590最新更新概述使用蒸汽压缩循环的冷水和热泵热水机组的性能等级
现行
DV-80-03-3
Control of a Heat Pump/Storage/Solar Hot Water-Chilled Water Central Plant
热泵/蓄热/太阳能热水-冷冻水集中装置的控制
现行
AHRI 550/590(I-P)-2011
Performance Rating of Water Chilling Packages Using the Vapor Compression Cycle
使用蒸汽压缩循环的冷水机组的性能等级
现行
AHRI 551/591(SI)-2011
Performance Rating of Water Chilling Packages Using the Vapor Compression Cycle
使用蒸汽压缩循环的冷水机组的性能等级
现行
AC-83-05-1
An Ammonia-Water Absorption Heat Pump Cycle
氨水吸收式热泵循环
现行
CSC/T 41-2005
溴化锂吸收式冷水机组 节能产品认证技术要求
2005-10-25