This part of IEC 62872 defines the interface, in terms of information flow, between industrial facilities and the "smart grid". It identifies, profiles and extends where required, the standards needed to allow the exchange of the information needed to support the planning, management and control of electric energy flow between the industrial facility and the smart grid.
The scope of this document specifically excludes the protocols needed for the direct control of energy resources within a facility where the control and ultimate liability for such control is delegated by the industrial facility to the external entity (e.g. distributed energy resource (DER) control by the electrical grid operator).Cross References:IEC TS 62443-1-1:2009IEC 62264-1:2013IEC TR 62443-3-1IEC 62443-3-3IEC 62443 (all parts)IEC 62443-2-1IEC TR 62357-1IEC 61511 (all parts)IEC 61968 (all parts)ISO/IEC TR 15067-3IEC 61850 (all parts)IEC 62264 (all parts)IEC 61508 (all parts)IEC 62430ISO 20140-1IEC 61784-3IEC 60050-617:2009ISO 14040:2006ISO/IEC TR 10000-1:1998IEC 62746-10-1:2018IEC TS 61968-2:2011ISO 17800:2017IEC TR 62837:2013IEC 61970-301:2013All current amendments available at time of purchase are included with the purchase of this document.