首页 馆藏资源 舆情信息 标准服务 科研活动 关于我们
现行 AWWA ACE56289
到馆提醒
收藏跟踪
购买正版
Denver Water Treated Water Storage Reservoir Study 丹佛净水蓄水池研究
发布日期: 2002-06-16
丹佛水务公司对丹佛系统的净化水库进行了全面审查。 科罗拉多州莱克伍德市的咨询工程师贝茨工程公司(Bates Engineering)受聘负责该项目 学习这项研究的重点是可用容量、流速、水质、维护、安全和环保 16个净化水水库设施的结构问题。大约65%的存储空间是可用的。 对每个储层进行了结构完整性检查,重点是裂缝、腐蚀和天气 损坏审查了生命和安全问题。对密封剂和修补涂层进行了测试 有害物质。编写了一份载有建议清单的综合报告,以供参考 作为未来操作和维护活动的指南。
Denver Water conducted a comprehensive review of treated water reservoirs in the Denver system. A consulting engineer, Bates Engineering of Lakewood, Colorado, was hired to conduct the study. The study focused on usable capacity, flow rates, water quality, maintenance, safety and structural issues at 16 treated water reservoir facilities. Approximately 65% of storage is usable. Each reservoir was examined for structural integrity focusing on cracks, corrosion, and weather damage. Life and safety issues were reviewed. Sealants and repair coatings were tested for hazardous materials. A comprehensive report with a list of recommendations was produced to serve as a guide for future operations and maintenance activities.
分类信息
发布单位或类别: 美国-美国给水工程协会
关联关系
研制信息
相似标准/计划/法规