首页 馆藏资源 舆情信息 标准服务 科研活动 关于我们
现行 AWWA DSS69202
到馆提醒
收藏跟踪
购买正版
A Better Way to Calibrate Grid Mains in Water Distribution System Models 配水系统模型中校准电网干管的更好方法
发布日期: 2008-11-01
本powerpoint演示文稿首先列出五个主要讨论点。在配水系统中,首先是关闭阀门,其次是关闭阀门的原因,以及关闭阀门的影响。现场测试和模型校准是第二个主题,包括水力坡度线测试, 传统的全系统测试,以及 典型的传导干线干线(e12英寸)。本文总结了华盛顿郊区一家公用事业公司的案例研究。本文介绍了新测试方法的成本影响,以及业务流程集成。包括数字。
This powerpoint presentation begins by listing five main discussion points. Closed valves in water distribution systems is the first, along with causes of closed valves, and closed valve implications. Field testing and model calibration is the second topic and includes hydraulic grade line test, traditional system wide test, and typically conducted trunk mains (e12 inch). A case study of a suburban Washington, D.C. utility is summarized. Cost implications of newer test methods are presented, along with business process integration. Includes figures.
分类信息
发布单位或类别: 美国-美国给水工程协会
关联关系
研制信息
相似标准/计划/法规