现行 NB/T 20509-2018
到馆提醒
收藏跟踪
购买正版
压水堆核电厂机组负荷扰动试验 Unit load swing test for pressurized water reactor nuclear power plant
发布日期: 2018-03-22
实施日期: 2018-09-01
本标准规定了压水堆核电厂机组负荷扰动试验的目的、试验条件、注意事项、试验内容和验收准则等。 本标准适用于压水堆核电厂调试启动阶段机组负荷扰动试验
分类信息
关联关系
研制信息
相似标准/计划/法规
现行
NB/T 20468-2017
压水堆核电厂甩负荷试验技术导则
Load rejection test guideline for pressurized water reactor of nuclear power plant
2017-04-01
现行
GB/T 41576-2022
压水堆核电厂装料后机组性能试验要求
Requirements for unit performance test after initial fuel loading of pressurized water reactor nuclear power plants
2022-07-11
现行
NB/T 20434-2017
压水堆核电厂反应堆首次装料试验
Initialloading test for pressurized water reactor of nuclear power plant
2017-04-01
现行
NB/T 20144-2012
核压水堆核电厂反应堆首次临界试验
Initial criticality tests for pressurized water reactor of nuclear power plants
2012-10-19
现行
GB/T 41591-2022
压水堆核电厂反应堆首次临界试验
Initial criticality tests for pressurized water reactor of nuclear power plants
2022-07-11
现行
NB/T 25116-2020
压水堆核电厂非核蒸汽冲转试验导则
Directive of turbine steam admission and no-load operation test for pressurized water reactor nuclear power plants
2020-10-23
现行
NB/T 20435-2017
压水堆核电厂反应堆调试启动堆芯物理试验
Physics tests for pressurized water reactor of nuclear power plants commissioning startup
2017-04-01
现行
NB/T 20240-2013
压水堆核电厂重新装料后的物理启动试验
Reload startup physics tests for pressurized water reactors of nuclear power plant
2013-06-08
现行
GB/T 41584-2022
压水堆核电厂装料前热态性能试验要求
Requirements for hot performance test before initial fuel loading of pressurized water reactor nuclear power plants
2022-07-11
现行
GB/T 41587-2022
压水堆核电厂装料前冷态性能试验要求
Requirements for cold performance test before initial fuel loading of pressurized water reactor nuclear power plants
2022-07-11
现行
NB/T 20064-2012
压水堆核电厂反应堆堆芯仪表系统安装和试验要求
Installation and test requirement of in-core instrumentation system in pressured water reactor nuclear power plant
2012-01-06
现行
NB/T 20441-2017
压水堆核电厂蒸汽发生器二次侧水压试验技术规程
Technical regulation of hydrostatic test for secondary part of the steam generator of pressurized water reactor nuclear power plants
2017-04-01
现行
NB/T 20484-2018
压水堆核电厂核蒸汽供应系统热平衡试验
Nuclear steam supply system heat balance test of pressurized water reactor nuclea-r power plant
2018-03-22
现行
NB/T 20215-2013
压水堆核电厂用于堆芯中子注量率测量的可移动式微型裂变室型式试验
Type test of movable micro-fission chamber for pressurized water reactor nuclear power plants in-core neutron flux measurement
2013-06-08
现行
NB/T 20133.5-2012
压水堆核电厂设施设备防护涂层规范 第5部分:涂层系统耐化学介质的测定
Specifications for protective coatings used in pressurized water reactor nuclear power plants-Part 5:Standard test method for chemical resistance
2012-01-06
现行
NB/T 20133.3-2012
压水堆核电厂设施设备防护涂层规范 第3部分:涂层系统受γ射线辐照影响的试验方法
Specifications for protective coatings used in pressurized water reactor nuclear power plants-Part 3:Standard test method for effects of gamma radiation
2012-01-06
现行
NB/T 20560.7-2021
压水堆核电厂应急堆芯冷却系统过滤器设计和性能评价 第7部分:下游效应(堆芯内)试验技术要求
Design and performance evaluation of emergency core cooling system strainer for pressurized water reactor nuclear power plant—Part 7: Technical requirements for downstream(in-vessel) effects test
2021-04-26
现行
NB/T 20133.2-2012
压水堆核电厂设施设备防护涂层规范 第2部分:涂层系统在模拟设计基准事故条件下的评价试验方法
Specifications for protective coatings used in pressurized water reactor nuclear power plants-Part 2:Standard test method for evaluating coatings at simulated design basis acciden(DBA)conditions
2012-01-06