Using Trenchless Construction and Upfront Planning to Minimize Public Impacts during Rehabilitation of a 16-inch PVC Recycled Water Transmission Main
在修复16英寸PVC循环水输水干管期间 采用非开挖施工和前期规划 将公共影响降至最低
This powerpoint presentation begins by providing a brief overview of the Oak Park/North Ranch recycled water system. The 2006 failure is presented, along with rehabilitation method selection, material selection, design considerations, thrust restraint, supply outages, temporary supplies, shutdown schematics in contract documents, traffic issues and mitigation, and public outreach.