首页 馆藏资源 舆情信息 标准服务 科研活动 关于我们
现行 EJ/T 1114-2000
到馆阅读
收藏跟踪
购买正版
压水堆核电厂反应堆首次装料试验 Initial loading test for PWR nuclear power plant
发布日期: 2001-02-28
实施日期: 2001-08-01
分类信息
关联关系
研制信息
相似标准/计划/法规
现行
NB/T 20316-2014
压水堆核电厂装料前热态性能试验要求
Requirements for hot functional tests before core loading for PWR nuclear power plants
2014-10-15
现行
EJ/T 1115-2000
压水堆核电厂反应堆低功率物理试验
Physics tests at low power for PWR nuclear power plant
2001-02-28
现行
NB/T 20018-2021
压水堆核电厂安全壳密封性试验
Containment leaktightness test for PWR nuclear power plants
2021-01-07
现行
NB/T 20141-2012
压水堆核电厂新燃料组件包装、运输、装卸和贮存规定
Packaging,transportation,loading & unloading and storage of fresh fuel assembly for PWR nuclear power plant
2012-01-06
现行
NB/T 20144-2012
核压水堆核电厂反应堆首次临界试验
Initial criticality tests for pressurized water reactor of nuclear power plants
2012-10-19
现行
GB/T 41591-2022
压水堆核电厂反应堆首次临界试验
Initial criticality tests for pressurized water reactor of nuclear power plants
2022-07-11
现行
GB/T 41576-2022
压水堆核电厂装料后机组性能试验要求
Requirements for unit performance test after initial fuel loading of pressurized water reactor nuclear power plants
2022-07-11
现行
GB/T 41584-2022
压水堆核电厂装料前热态性能试验要求
Requirements for hot performance test before initial fuel loading of pressurized water reactor nuclear power plants
2022-07-11
现行
GB/T 41587-2022
压水堆核电厂装料前冷态性能试验要求
Requirements for cold performance test before initial fuel loading of pressurized water reactor nuclear power plants
2022-07-11
现行
NB/T 20348-2015
压水堆核电厂安全壳永久性仪表系统的安装和试验技术规程
Technical specification for installation and test of containment instrumentation system of PWR nuclear power plants
2015-07-01
现行
NB/T 20010.9-2010
压水堆核电厂阀门 第9部分:产品出厂检查与试验
PWR nuclear power plant valve-Part 9:Final examination and test in manufactory
2010-05-24
现行
EJ/T 1228-2008
压水堆核电厂控制棒驱动线热态试验要求
Experiment demand for thermal tests on control rod drive line of PWR nuclear power plant
2008-03-17
现行
NB/T 20345-2015
压水堆核电厂燃料破损啜吸装置安装与试验技术规程
Technical specification for installation and test of faulted fuel sipping device in PWR nuclear power plants
2015-07-01
现行
NB/T 20509-2018
压水堆核电厂机组负荷扰动试验
Unit load swing test for pressurized water reactor nuclear power plant
2018-03-22
现行
NB/T 20468-2017
压水堆核电厂甩负荷试验技术导则
Load rejection test guideline for pressurized water reactor of nuclear power plant
2017-04-01
现行
NB/T 25116-2020
压水堆核电厂非核蒸汽冲转试验导则
Directive of turbine steam admission and no-load operation test for pressurized water reactor nuclear power plants
2020-10-23