首页 馆藏资源 舆情信息 标准服务 科研活动 关于我们
现行 AWWA ACE63242
到馆提醒
收藏跟踪
购买正版
Water Accountability Moves Forward in Austin 奥斯汀水资源问责工作取得进展
发布日期: 2006-06-01
本幻灯片概述了德克萨斯州奥斯汀市的水资源问责工作。概述的主题包括: 水资源问责委员会,成立于2004年底,以回应新的州水资源管理局 审计要求; 非收入水成分,如水表不准确,以及配水系统泄漏和破裂造成的实际损失; FY05水资源审计的初步结果,包括水资源审计软件;和 公用事业的下一步,包括继续问责委员会, 完成详细的年度水资源审计, 实施增强型仪表测试和维修 程序 进一步量化实际损失的组成部分,以及 实施系统的泄漏检测工作。包括表格、数字。
This slide presentation outlines water accountability efforts in Austin, Texas. Topics outlined include: Water Accountability Committee, formed in late 2004 in response to new state water audit requirement; non-revenue water components such as meter inaccuracies and real loss from leaks and breaks in the distribution system; initial results of the FY05 Water Audit, including water audit software; and, next steps for the utility, including continue Accountability Committee, complete detailed Annual Water Audit, implement Enhanced Meter Testing and Repair Program, further quantify the components of real losses, and implement systematic leak detection efforts. Includes tables, figures.
分类信息
发布单位或类别: 美国-美国给水工程协会
关联关系
研制信息
相似标准/计划/法规