首页 馆藏资源 舆情信息 标准服务 科研活动 关于我们
现行 DL/T 5001-2014
到馆阅读
收藏跟踪
购买正版
火力发电厂工程测量技术规程 Technical code for engineering survey of fossil-fired power plant
发布日期: 2014-10-15
实施日期: 2015-03-01
分类信息
关联关系
研制信息
相似标准/计划/法规
现行
DL/T 5094-2012
火力发电厂建筑设计规程(附条文说明)
Technical code for architectural design of fossil-fired power plant
2012-01-04
现行
DL/T 5153-2014
火力发电厂厂用电设计技术规程(附条文说明)
Technical code for the design of auxiliary power system of fossil-fired power plant
2014-10-15
现行
DL 5022-2012
火力发电厂土建结构设计技术规定(附条文说明)
Technical code for the design of civil structure of fossil-fired power plant
2012-01-04
现行
DL/T 5456-2012
火力发电厂信息系统设计技术规定
Technical code for the design of information system of fossil-fired power plant
2012-08-23
现行
DL/T 5041-2012
火力发电厂厂内通信设计技术规定(附条文说明)
Technical code for the design of fossil-fired power plant inner communication
2012-01-04
现行
DL/T 5074-1997
火力发电厂岩土工程勘测技术规程
Technical code for investigation of geotechnical engineering of fossil fuel power plant
1997-09-02
现行
DL/T 5142-2012
火力发电厂除灰设计技术规程(附条文说明)
Technical code for the design of ash handling system of fossil-fired power plant
2012-08-23
现行
DL/T 5240-2010
火力发电厂燃烧系统设计计算技术规程
Technical code for design and calculation of combustion system of fossil-fired power plant
2010-05-24
现行
DL/T 5136-2012
火力发电厂、变电站二次接线设计技术规程
Technical code for the design of electrical secondary wiring in fossil-fired power plants and substations
2012-11-09
现行
DL/T 5145-2012
火力发电厂制粉系统设计计算技术规定
Technical code for design and calculations of coal pulverizing system of fossil-fired power plant
2012-08-23
现行
DL/T 5097-2014
火力发电厂贮灰场岩土工程勘测技术规程(附条文说明)
Technical code for investigation of geotechnical engineering of ash yard of fossil fuel power plant
2014-10-15
现行
DL/T 5409.4-2010
核电厂工程勘测技术规程 第4部分:测量
Technical code for engineering investigation of nuclear power plants Part 4:surveying
2010-05-24
现行
DL/T 5455-2012
火力发电厂热工电源及气源系统设计技术规程
Technical code for the design of power supply and air supply system of instrumentation & control in fossil-fired power plant
2012-08-23
现行
DL/T 5187.1-2016
火力发电厂运煤设计技术规程 第1部分:运煤系统
Technical code for designing coal handling fossil fired power plant Part 1:Coal handling system
2016-08-16
现行
DL/T 5489-2014
火力发电厂循环水泵房进水流道设计规范
Technical code for design of inlet flow passage of circulating water pump house of fossil-fired power plant
2014-06-29
现行
DL/T 5187.2-2019
火力发电厂运煤设计技术规程 第2部分:煤尘防治
Technical Code for designing coal handling of fossil fired power plant Part 2: Dust prevention and control
2019-11-04
现行
DL/T 5187.3-2012
火力发电厂运煤设计技术规程第3部分:运煤自动化
Technical code for the design of coal handling fossil-fired power plant Part 3:Coal handling automation system
2012-01-04