首页 馆藏资源 舆情信息 标准服务 科研活动 关于我们
现行 DID DI-MGMT-81826D
到馆提醒
收藏跟踪
购买正版
F/A-18 and EA-18 AIRCRAFT / SYSTEM PROGRAM PROTECTION IMPLEMENTATION PLAN F/A-18和EA-18飞机/系统项目保护实施计划
发布日期: 2018-06-12
承包商F/A-18(所有系列)和EA-18G项目保护实施应在F/A-18(所有系列)和EA-18飞机/系统承包商项目保护实施计划(PPIP)中进行定义,该计划是DD-254《工作说明书》(SOW)、国防部合同和,政府最新发布的F/A-18和EA-18G计划保护计划(PPP)(包括附件)、F/A-18大黄蜂(全系列)和EA-18G咆哮者飞机/系统安全指南以及适用于F/A-18(全系列)和EA-18G飞机和系统的安全分类指南。
The Contractors F/A-18 (All Series) and EA-18G Program Protection Implementation shall be defined within the F/A-18 (All Series) and EA-18 Aircraft / System Contractors Program Protection Implementation Plan (PPIP) which is a result of the program protection requirements set forth in the DD-254, Statement of Work (SOW), DoD Contract, the Government's F/A-18 and EA-18G Program Protection Plan (PPP) (including Annexes) most current issuance, the Security Guidance for F/A-18 Hornet (All Series) and the EA-18G Growler Aircraft / Systems and Security Classification Guides applicable for the F/A-18 (All Series) and EA-18G Aircraft and Systems.
分类信息
发布单位或类别: 美国-数据项说明
关联关系
研制信息
相似标准/计划/法规