"No Concrete" Option Doubles the Kennewick Water Filtration Plant's Capacity: The Submerged Membrane Retrofit Approach
“无混凝土”选项使肯纳威克滤水厂的容量翻了一番:浸没式膜改造方法
This paper highlights the treatment process evaluation that led up to the selection of
submerged membranes for the City of Kennewick, Washington's Water Filtration Plant (WFP) Improvements Project. Membrane
vendor considerations and the membrane system procurement process are presented
along with a discussion of the design approach and considerations for implementing a
new technology to retrofit Kennewick's conventional water filtration plant. Includes 2 references, tables, figures.