BS ISO 15118-5:2018 specifies conformance tests in the form of an Abstract Test Suite (ATS) for a
System Under Test (SUT) implementing an Electric Vehicle or Supply Equipment Communication
Controller (EVCC or SECC) with support for PLC-based High Level Communication (HLC) and
Basic Signaling according to ISO 15118-3. These conformance tests specify the testing of capabilities
and behaviors of an SUT, as well as checking what is observed against the conformance
requirements specified in ISO 15118-3 and against what the implementer states the SUT
implementation's capabilities are.The capability tests within the ATS check that the observable capabilities of the SUT are in accordance
with the static conformance requirements defined in ISO 15118-3. The behavior tests of the ATS
examine an implementation as thoroughly as is practical over the full range of dynamic conformance
requirements defined in ISO 15118-3 and within the capabilities of the SUT.A test architecture is described in correspondence to the ATS. The conformance test cases in this part of
the standard are described leveraging this test architecture and are specified in TTCN-3 Core Language
for the ISO/OSI Physical and Data Link Layers (Layers 1 and 2). The conformance test cases for the
ISO/OSI Network Layer (Layer 3) and above are described in ISO 15118-4.In terms of coverage, this document only covers normative sections and requirements in ISO 15118?3.This document can additionally include specific tests for requirements of referenced standards
(e.g. IEEE, or industry consortia standards) as long as they are relevant in terms of
conformance for implementations according to ISO 15118-3. However, it is explicitly not
intended to widen the scope of this conformance specification to such external standards, if it is
not technically necessary for the purpose of conformance testing for ISO 15118-3. Furthermore, the
conformance tests specified in this document do not include the assessment of performance
nor robustness or reliability of an implementation. They cannot provide judgments on the
physical realization of abstract service primitives, how a system is implemented, how it provides
any requested service, nor the environment of the protocol implementation. Furthermore, the test
cases defined in this document only consider the communication protocol and the system's behavior
defined ISO 15118-3. Power flow between the EVSE and the EV is not considered.Cross References:IEC 61851-1:2017ISO 15118-1:2013ISO 15118-2:2014ISO 15118-3:2015All current amendments available at time of purchase are included with the purchase of this document.