首页 馆藏资源 舆情信息 标准服务 科研活动 关于我们
现行 AWWA DSS60336
到馆提醒
收藏跟踪
购买正版
Bringing a River Water Treatment Plant into Compliance Cost Effectively 使河水处理厂符合成本效益
发布日期: 2004-09-29
本幻灯片演示概述了使东莫林市水处理厂符合临时强化地表水处理规则和消毒剂/消毒副产品规则(D/DBPR)的项目信息。其他问题包括:满足未来法规的要求,如过滤器反洗规则和第2阶段微生物和D/DBPR,确保适当的化学预处理,确保适当的快速混合和絮凝,以及降低成品水浊度。主题包括:季节性水质问题;历史水质总结;现场平面图;原水泵、快速混合池、絮凝沉淀池的改进;替代处理技术;估计可能的建设成本;以及努力的结果。
This slide presentation outlines information on a project to bring the City of East Moline Water Treatment Plant into compliance with the Interim Enhanced Surface Water Treatment Rule and the Disinfectants/Disinfection Byproducts Rule (D/DBPR). Other concerns included: meeting the requirements of future regulations such as the Filter Backwash Rule and the Stage 2 Microbial and D/DBPR, ensuring proper chemical pretreatment, ensuring proper rapid mix and flocculation, and reducing finished water turbidity. Topics covered include: seasonal water quality issues; historical water quality summary; site plan; improvements to raw water pumps, rapid mix basins, flocculation and sedimentation basins; alternative treatment technologies; estimate of probable construction costs; and, results of the effort.
分类信息
发布单位或类别: 美国-美国给水工程协会
关联关系
研制信息
相似标准/计划/法规