首页 馆藏资源 舆情信息 标准服务 科研活动 关于我们
现行 ULC 61328
到馆提醒
收藏跟踪
购买正版
LIVE WORKING - GUIDELINES FOR THE INSTALLATION OF TRANSMISSION AND DISTRIBUTION LINE CONDUCTORS AND EARTH WIRES - STRINGING EQUIPMENT AND ACCESSORY ITEMS 带电作业输电线路导线和地线安装指南架线设备和附件(CEI/IEC61328-2003)(CAN/ULC 61328)
发布日期: 2021-08-26
加拿大国家标准提供了架空导线和架空地线安装所需的导线架线设备和附件的选择和测试建议。建议采用适当接地的程序,以保护设备、部件和人员免受可能导致某些情况的感应或故障电流的影响。本加拿大国家标准中考虑的设备用于传输电压,通常被认为是100 kV及以上,但可能低至60 kV。所述的许多要求和试验也适用于小于100 kV的配电系统中使用的设备。
This National Standard of Canada provides recommendations for the selection and testing where necessary of conductor stringing equipment and accessory items used for the installation of overhead conductors and overhead earthwires.Procedures are recommended for proper earthing in order to protect equipment, components and personnel from the induced or fault currents which can result in some circumstances.The equipment under consideration in this National Standard of Canada is used for transmission voltages which are usually considered to be 100 kV and above, but may be as low as 60 kV. Many of the requirements and tests stated apply also to equipment used in distribution systems with less than 100 kV.
分类信息
发布单位或类别: 美国-美国保险商实验所
关联关系
研制信息
相似标准/计划/法规
现行
BS PD IEC/TR 61328-2017
Live working. Guidelines for the installation of transmission and distribution line conductors and earth wires. Stringing equipment and accessory items
现场工作 输配电线路导线和接地线安装指南 架线设备和配件
2017-12-31
现行
KS C IEC TR 61328
활선작업 — 송배전선 및 가공지선 설치 지침 — 가선 장비 및 부속품
带电作业输配电线路导线和接地线安装导则架线设备和附件
2024-06-11
现行
UNE 21737-1998
LIVE WORKING. INSTALLATION OF TRANSMISSION LINE CONDUCTORS AND EARTHWIRES. STRINGING EQUIPMENT AND ACCESORY ITEMS.
现场工作 输电线路导线和接地线的安装 架线设备和配件
1998-04-30
现行
BS PD IEC/TR 62263-2005
Live working. Guidelines for the installation and maintenance of optical fibre cables on overhead power lines
现场工作 架空电力线上光缆的安装和维护指南
2005-12-13
现行
IEC TR 62263-2005
Live working - Guidelines for the installation and maintenance of optical fibre cables on overhead power lines
带电作业.架空电力线路上光纤电缆的安装和维护指南
2005-12-13
现行
CAN/ULC 62263-11
Live working - Guidelines for the installation and maintenance of optical fibre cables on overhead power lines
带电作业.架空电力线路上光纤电缆的安装和维护指南
2011-08-01
现行
DL/T 1007-2006
架空输电线路带电安装导则及作业工具设备
Live wording-Guidelines for the installation of transmission line conductors and earthwires-Stringing equipment and accessory items
2006-09-14
现行
ULC 61911
Live Working - Guidelines for the Installation of Distribution Line Conductors - Stringing Equipment and Accessory Items (CEI/IEC 61911: 2003) (CAN/ULC 61911)
带电作业配电线路导线安装指南架线设备和附件(CEI/IEC 61911:2003)(CAN/ULC 61911)
2005-06-01