首页 馆藏资源 舆情信息 标准服务 科研活动 关于我们
现行 AWWA CO50823
到馆提醒
收藏跟踪
购买正版
Securing an Adequate Long-Term Water Supply for Birmingham, AL 确保伯明翰市有充足的长期供水
发布日期: 1999-09-01
本报告的目的是介绍对委员会过去水资源研究的评估结果,并提出一个概念框架,以满足伯明翰地区未来50年的水需求。良好的水资源计划提供将水源水输送至处理设施和原水客户的输送能力、充足的处理能力、需求管理计划、干旱水管理计划、水质监测计划和公众参与计划。水资源规划最重要的方面是它的灵活性。该动态程序将能够响应董事会系统的变化和客户需求的变化。包括表格,如图所示。
The objective of this report was to present the findings from an evaluation of past studies of the water resources of the Board and to present a conceptual framework for meeting future water needs of the Birmingham area for the next 50 years. A good water resource plan provides transmission capacity to deliver the source water to treatment facilities and raw water customers, adequate treatment capacity, a demand management plan, a drought water management plan, a water quality monitoring program, and a public participation program. The most important aspect of the water resource plan is that it is flexible. This dynamic program will be capable of responding to changes to the Board's system and changing customer needs. Includes tables, figure.
分类信息
发布单位或类别: 美国-美国给水工程协会
关联关系
研制信息
相似标准/计划/法规