Surface Water Conversion without Compromising Your Water Quality Goals
在不影响水质目标的情况下进行地表水转化
发布日期:
2009-11-01
本powerpoint演示文稿首先简要概述了德克萨斯州的Sugar Land市,并介绍了一个项目,该项目旨在建立一个
地表水处理厂(SWTP)满足本德堡沉降区的强制减排要求
到2013年和2025年,地下水使用量将分别减少30%和60%。项目规划面临的挑战,
介绍了试点和初步设计,以及项目分期和规划、平板澄清器中试测试结果、中试微滤/超滤(MF/UF)系统、MF/UF中试测试计划和结果、工厂工艺示意图、Sugar Land SWTP设计特点、施工和运行维护的估计成本、项目进度挑战可能需要的时间
可供选择的交付方式,以及社区的积极参与。
包括表格、数字。
This powerpoint presentation begins by providing a brief overview of the city of Sugar Land, Texas, and a project to build a
surface water treatment plant (SWTP) to meet Fort Bend Subsidence District's mandated reduction
of groundwater use by 30% by 2013 and 60% by 2025. Challenges faced in project planning,
piloting, and preliminary design are presented, along with project staging and planning, plate clarifier pilot testing results, piloted microfiltration/ultrafiltration (MF/UF) systems, MF/UF pilot testing program and results, plant process schematic, Sugar Land SWTP design features, estimated costs for construction and operation and maintenance, project schedule challenge may require
alternative delivery, and proactive engagement of the community.
Includes tables, figures.