首页 馆藏资源 舆情信息 标准服务 科研活动 关于我们
现行 BS EN IEC 63132-4:2020
到馆提醒
收藏跟踪
购买正版
Guidance for installation procedures and tolerances of hydroelectric machines-Vertical Kaplan or propeller turbines 水力发电机械安装程序和公差指南
发布日期: 2020-07-01
IEC 63132本部分的目的是在一般情况下确定合适的 垂直卡普兰或螺旋桨涡轮机的安装程序和公差。这 本文件介绍了一个典型的总成,以及本文件中使用的“涡轮机”一词 文件中,它指的是垂直卡普兰或螺旋桨涡轮机。有很多可能的方法 组装一个单元。机器的尺寸、机器的设计、发电厂房的布局或 组件的交付时间表是可能导致额外损失的一些因素 步骤,消除某些步骤和/或装配顺序。购买本文件时可获得的所有当前修订均包含在购买本文件中。
The purpose of this this part of IEC 63132 is to establish, in a general way, suitable procedures and tolerances for the installation of a vertical Kaplan or propeller turbine. This document presents a typical assembly and whenever the word "turbine" is used in this document, it refers to a vertical Kaplan or propeller turbine. There are many possible ways to assemble a unit. The size of the machine, design of the machine, layout of the powerhouse or delivery schedule of the components are some of the elements that could result in additional steps, the elimination of some steps and/or assembly sequences.All current amendments available at time of purchase are included with the purchase of this document.
分类信息
发布单位或类别: 英国-英国标准学会
关联关系
研制信息
相似标准/计划/法规
现行
BS EN IEC 63132-2-2020
Guidance for installation procedures and tolerances of hydroelectric machines-Vertical generators
水力发电机械安装程序和公差指南
2020-06-09
现行
KS C IEC 63132-2
수력 기계의 설치 절차 및 허용오차에 대한 지침 — 제2부: 수직 발전기
水轮机安装程序和公差指南第2部分:立式发电机
2023-11-24
现行
KS B IEC 63132-1
수력 기계의 설치 절차 및 허용오차에 대한 지침 — 제1부: 일반 사항
水力发电机械安装程序和公差指南.第1部分:总则
2022-05-25
现行
IEC 63132-2-2020
Guidance for installation procedures and tolerances of hydroelectric machines - Part 2: Vertical generators
水轮机安装程序和公差指南第2部分:立式发电机
2020-04-20
现行
IEC 63132-1-2020
Guidance for installation procedures and tolerances of hydroelectric machines - Part 1: General aspects
水轮机安装程序和公差指南第1部分:通用
2020-04-20
现行
BS EN IEC 63132-3-2020
Guidance for installation procedures and tolerances of hydroelectric machines-Vertical Francis turbines or pump-turbines
水力发电机械安装程序和公差指南
2020-07-02
现行
IEC 63132-6-2023
Guidance for installation procedures and tolerances of hydroelectric machines - Part 6: Vertical Pelton turbines
水力发电设备的安装程序和公差指南.第6部分:立式Pelton涡轮机
2023-04-14
现行
IEC 63132-5-2023
Guidance for installation procedures and tolerances of hydroelectric machines - Part 5: Bulb turbines and generators
水力发电设备的安装程序和公差指南.第5部分:灯泡式水轮机和发电机
2023-04-14
现行
KS C IEC 63132-4
수력 기계의 설치 절차 및 허용오차에 대한 지침 — 제4부: 수직 카플란 또는 프로펠러 수차
水轮机安装程序和公差指南第4部分:垂直轴流转桨式或螺旋桨式水轮机
2023-11-24
现行
IEC 63132-4-2020
Guidance for installation procedures and tolerances of hydroelectric machines - Part 4: Vertical Kaplan or propeller turbines
水轮机安装程序和公差指南第4部分:立式轴流转桨式水轮机
2020-04-28
现行
KS C IEC 63132-3
수력 기계의 설치 절차 및 허용오차에 대한 지침 — 제3부: 수직 프란시스 수차 또는 펌프 수차
水轮机安装程序和公差指南第3部分:立式混流式水轮机或水泵水轮机
2023-11-24
现行
IEC 63132-3-2020
Guidance for installation procedures and tolerances of hydroelectric machines - Part 3: Vertical Francis turbines or pump-turbines
水轮机安装程序和公差指南第3部分:立式混流式水轮机或水泵水轮机
2020-04-28