Assessment Criteria for Commissioning and Construction Quality Control - Assessing the Effectiveness of Total Building Commissioning 试运行和施工质量控制评估标准-评估整个建筑试运行的有效性
记录整个建筑调试计划有效性的评估结果。自1991年以来,马里兰州一个县的政府已将ASHRAE调试指南整合到一个名为施工质量控制(CQC)的总体建筑调试计划中。州CQC将HVAC调试放在施工过程内部,而不是外部。然而,它比ASHRAE调试指南更广泛。CQC项目侧重于项目的全面质量保证。CQC项目采用的方法涵盖了建筑设施中的每个主要组件或系统。CQC涵盖了从热封完整性、基础和结构元件、屋面系统和暖通空调和电气系统到控制系统和特殊系统如火灾报警和急诊科系统。关键词:建筑、美国、调试、法规、质量控制、建筑服务行业: 研讨会,ASHRAE Trans。1994年,第100卷,第2部分
Documents the results of an evaluation of the effectiveness of a total building commissioning program. Since 1991 the government in a Maryland county has integrated the ASHRAE commissioning guidelines into a total building commissioning programme called Construction Quality Control (CQC). States CQC places HVAC commissioning within, not outside, the construction process. It is, however, broader than the ASHRAE commissioning guidelines. The CQC program focuses on the total quality assurance of a project. The approach taken by the CQC programme covers every major component or system in a building facility. CQC covers everything from the thermal envelope integrity, foundation and structural elements, roofing system and HVAC and electrical systems to control systems and special systems such as fire alarm and emergency power systems.KEYWORDS: Buildings, USA, commissioning, regulations, quality control, building services
分类信息
关联关系
研制信息
相似标准/计划/法规