首页 馆藏资源 舆情信息 标准服务 科研活动 关于我们
现行 AWWA JAW46187
到馆提醒
收藏跟踪
购买正版
Journal AWWA - Communication Strategies for Pipeline Construction AWWA期刊-管道施工的沟通策略
发布日期: 1997-07-01
圣迭戈县水资源管理局已经完成了一个3.4英里(5.5公里)长、72英里长的项目-加利福尼亚州圣地亚哥县西北部直径为1830 mm的饮用水管道和相关设施。北县配水管道项目包括管道、三个流量控制和计量设施、一个1-mil-gal(0.0004 x 10 6-m3)预应力混凝土调节结构和一个氯接触池。该管道平行并穿过两条24英寸长的管道-直径为610 mm的饮用水管道,为加利福尼亚州Oceanside提供85%的日常供水。施工于1995年3月开始,1996年底结束。包括数字。
The San Diego County Water Authority has nearly completed a 3.4-mi (5.5-km), 72-in.-(1,830-mm-) diameter potable water pipeline and associated facilities in northwest San Diego County, California. The north county distribution pipeline project includes the pipeline, three flow control and metering facilities, a 1-mil-gal (0.0004 x 10 6-m3) prestressed concrete regulating structure, and a chlorine contact tank. The pipeline parallels and crosses two 24-in.-(610-mm-) diameter potable lines that serve 85 percent of the daily water supply to Oceanside, California. Construction began in March 1995 and concluded late in 1996. Includes figures.
分类信息
发布单位或类别: 美国-美国给水工程协会
关联关系
研制信息
相似标准/计划/法规