首页 馆藏资源 舆情信息 标准服务 科研活动 关于我们
现行 DIN 2425-2
到馆提醒
收藏跟踪
购买正版
Plans for public supplies, for water engineering and for transmission lines; plans for pipe-systems for distant-heating 公共供应、水工程和输电线路计划;远距离供暖管道系统平面图
发布日期: 1977-07-01
分类信息
发布单位或类别: 德国-德国标准化学会
关联关系
研制信息
相似标准/计划/法规
现行
DIN 2425-1
Plans for public supplies, for water engineering and for transmission lines; plans for public pipesystems for gas and water supply
公共供应、水工程和输电线路计划;燃气和供水公共管道系统计划
1975-08-01
现行
DIN 2425-5
Plans for public supplies, water engineering and long-distance pipelines; maps and plans for water engineering
公共供应、水工程和长输管道计划;水工程地图和平面图
1983-10-01
现行
AWWA ACE92103
Public Water Supplies: Endangered Species or Secure? Planning and Engineering Issues
公共供水:濒危物种还是安全?规划和工程问题
1992-01-01
现行
GB 50282-2016
城市给水工程规划规范
Code for urban water supply engineering planning
2016-08-18
现行
CJJ/T 246-2016
镇(乡)村给水工程规划规范
Code for planning of town and village water supply engineering
2016-06-06
现行
CJJ 160-2011
公共浴场给水排水工程技术规程(附条文说明)
Technical specification for public SPA pool water supply and drainage engineering
2011-07-13
现行
AWWA WSC63697
Emergency Water Supply Operational Planning for Critical Public Services in the National Capital Region
国家首都地区关键公共服务应急供水运营规划
2006-09-01
现行
DIN 2425-6
Plans for public utilities, water resources management and for long-distance pipelines; Maps and plans for water engineering, flood and coastal protection
公用事业、水资源管理和长输管道计划;水利工程、洪水和海岸保护的地图和平面图
1982-02-01
现行
AWWA ACE56195
AwwaRF - Honolulu Board of Water Supply: Development of a Stragegic Plan - Portfolio Management for Public Utilities
AwwaRF——檀香山供水局:制定战略计划——公共事业投资组合管理
2002-06-16
现行
AWWA INF55787
Project Team Uses Effective Planning, Engineering, and Public Relations Tools for Raw Water Main Replacement Project
项目团队在原水干管更换项目中使用有效的规划、工程和公共关系工具
2002-01-01
现行
AWWA ACE58223
How Government Affairs, Public Communication and Engineering Can Work Together toward Successful Implementaton of Integrated Water Plans
政府事务、公共沟通和工程部门如何合作 成功实施综合水资源规划
2003-06-15
现行
AWWA ACE70616
Using Trenchless Construction and Upfront Planning to Minimize Public Impacts during Rehabilitation of a 16-inch PVC Recycled Water Transmission Main
在修复16英寸PVC循环水输水干管期间 采用非开挖施工和前期规划 将公共影响降至最低
2009-11-01